Coordinating Power and Installation for Motorised Louvres

Define responsibilities between the window supplier and electrical installer before fitting motorised louvres and completing interior finishes.

People reviewing building plans with a calculator and measuring tools
Illustrative photo.

The power requirements for a motorised louvre must come from the manufacturer’s instructions for the quoted equipment. Agree who supplies, connects and tests each part before frames and finishes are completed. The window supplier and electrical installer should be working from the same confirmed specification.

Obtain the instructions for the quoted system

Ask the window supplier for the installation and power requirements of the actual model being offered. Do not transfer voltage, wiring or control assumptions from a different product. The relevant electrical installer should work from the manufacturer’s documentation.

Identify the intended location of the power provision and any control equipment with the supplier. If components are concealed, ask how they can be accessed for service. A neat appearance should not leave a future technician unable to reach a replaceable part.

Write down the division of work

The quotation should make clear whether electrical provision, wiring, controller installation and testing are included or separate. Where more than one contractor is involved, identify who coordinates the final connection and demonstration.

Use opening references consistently. If only one window is motorised, mark it clearly on the schedule. A general note stating “power for windows” is less useful than a drawing or agreed list identifying the relevant locations.

Check the sequence before finishing

Ask which work must be completed before the frame is installed and which checks must happen before access is closed up. Record any unresolved item rather than assuming another trade will complete it.

At handover, request the operating demonstration and service instructions. Confirm the documented procedure for a loss of power and who should be contacted for an operating fault. These are coordination questions, not tasks for occupants to solve by experimenting with wiring or mechanisms.

Assign the work before it starts

Coordination checklist
TaskRecord the responsible party
Confirm equipment requirementsWindow supplier providing model-specific instructions.
Arrange power provisionNamed electrical installer, scope and agreed location.
Fit and configure controlsInstaller identified in the quotation.
Demonstrate the completed systemPerson coordinating the final handover.

Use the table to identify gaps between quotations. It does not assign electrical work to someone who is not qualified to carry it out.

Share the agreed requirements with both installers before finishing work begins. Our motorised aluminium louvre guide covers everyday operation and handover as well as installation.

Frequently asked questions

Who should specify the power provision for motorised louvres?

Use the manufacturer’s requirements for the quoted equipment. The window supplier and relevant electrical installer should agree on the installation responsibilities and provision before the surrounding finishes are completed.

What should the quote say about electrical work?

It should identify whether power provision, wiring, controls and testing are included or arranged separately. Name the party coordinating any connection between the window installation and the electrical scope.

Why discuss access to concealed operating equipment?

Equipment may need inspection or service later. Ask how the proposed installation allows appropriate access, rather than assuming that a neatly concealed component will be easy to reach.